mud recycling

GN 500 GPM mud recycling system is one of
the most hot sale system model for horizontal drilling directional drilling (HDD),
water well drilling, CBM drilling, as well as for some small workover rigs.

Water well drilling is very important; it
is not only used for human being life and industry purpose. For oil and gas
drilling field, it is also very important. Before start the operation of oil
drilling, the jobsite need to drill water well. As all the drilling activities
need to use water. They have to ensure water supplier before start drilling oil
and gas well.

One set trailer mounted GN 500 GPM mud cleaning system arrive client job site and highly commended by the clients.
The GN 500 GPM mud recycling system is designed for 1000m deep water well
drilling. It can also suit for 350hp drilling rigs and ZJ20, ZJ30 drilling
rigs.

It is a complete mud system including mud
treatment system and mud mxing system, as well as electric control system. GN
reserves a spare connect on the inlet and outlet pipe of the mixing pump. The
system can be used to mix mud in outside tanks, and it can transfer qualified
mud to outside tanks. Clients can connect the outside storage tank directly.  

The GN 500 GPM mud system is a customized
system per clients’ request. The system is including following equipment.

1) Solids Control shale shaker, model GNZS703E.
It is a linear motion shale shaker with 3-panel. Its capacity is 500GPM.

2) Mud cleaner GNZJ703E-D8N.It is a
combination of shale shaker and desilter cleaner.

3) Mud mixing system

4) Mud tank and accessories.

Besides this proposal, GN Solids Control
offers different standard mud system to cater for different jobsite condition.
GN have below standard design for 500gpm mud system:

1) The economic standard GNMS-500B mud
recycling system

2) The normal standard GNMS-500G mud
system.

3) The high standard GNMS-500GL mud system.
Compare with above proposal, this model is equipped with more treatment process
and with a bigger usable tank capacity.

GN company keeps for standard mud system,
welcome you contact GN for inquire.

3 sets GN fast removable mud recycling system for HDD rigs will be dispatched to the client this week. It is customized system for CPP rigs. CPP engineering team visit GN factory and check the system before dispatch and very satisfied. They are happy with the system quality and thanks very much for the continue technical supporting of GN Solids Control for the years. Till now, they have over 35 sets compact mud recycling systems from GN Solids Control. Most of the systems are for 500GPM capacity.

The 3 new systems are customized with 500gpm capacity also, but can up to as 1000GPM mud system capacity when needed.
The 500gpm ~ 1000 GPM mud recycling systems are composed of below equipment:
1) Mud tank 1 ea. The size of the tank is the same with 20ft standard container, and equipped with ISO blocks. Walkways and handrails are all foldable type design for fast movement. During inland shipment, the users no need to remove the walkways and handrails, they only need to take off the pin shaft and supporting beam of walkway, and fold up the walkway and handrails to the tank side wall.
2) Mud cleaner desander (model GNZS706E-2S) with double deck shale shaker. It is the combination of a double deck shale shaker and 2 each 10’’ desander cones. The bottom shaker deck can be used as solids control shale shaker for preseparation.
3) Mud desilter cleaner (model GNZS706E-8N) with a double deck shale shaker underneath. The bottom deck of the shaker will be used as solids control shale shaker.
The 1 ea desander mud cleaner and 1 ea desilter mud cleaner are mounted in a lifting frame, they can be moved as a compete part during shipment when needed.
4) Feeding pump for desander and desilter cones are mounted in the slope of the mud tank for a compact design.  
For other sizes of GN mud recycling system for HDD rigs, please you visit GN website or contact GN company for details.

Normal
0

7.8 磅
0
2

false
false
false

EN-US
ZH-CN
X-NONE

/* Style Definitions */
table.MsoNormalTable
{mso-style-name:普通表格;
mso-tstyle-rowband-size:0;
mso-tstyle-colband-size:0;
mso-style-noshow:yes;
mso-style-priority:99;
mso-style-qformat:yes;
mso-style-parent:””;
mso-padding-alt:0cm 5.4pt 0cm 5.4pt;
mso-para-margin:0cm;
mso-para-margin-bottom:.0001pt;
mso-pagination:widow-orphan;
font-size:10.5pt;
mso-bidi-font-size:11.0pt;
font-family:”Calibri”,”sans-serif”;
mso-ascii-font-family:Calibri;
mso-ascii-theme-font:minor-latin;
mso-hansi-font-family:Calibri;
mso-hansi-theme-font:minor-latin;
mso-font-kerning:1.0pt;}

CIPPE is the short name of China
International Petroleum & Petrochemical Technology and Equipment Exhibition.
It is the second largest worldwide oil show. It is held every March in Beijing
International Conference Center. Every year, nearly 2000 companies come from
different countries for the show. 

GN Solids Control is China top manufacturer
on drilling waste management equipment. GN group just back from 2015 CIPPE oil
show with big success. As a frequent comer for CIPPE oil show, GN takes its
latest and advanced design equipment for the show. And get great attention and
admiration from both his customers and competitors. They are surprised with GN’s
advanced design equipment and admire his big improvement year by year. There
are many customers work with GN for many year and experience GN growth by
themselves. Every year, GN will show them a complete new look with so many surprise.

Unlike other companies, GN will never copy
any one. GN only care the needs and request of customer and jobsite. And offer
customer with the most reliable products and services.

Drilling waste management equipment GN showed
for Beijing oil show

1) 9’’ Mini centrifuge decanter, GNLW223

It is the mini size decanter centrifuge,
mostly used for coal drilling with small capacity, small footprint and high
speed. It is also called baby centrifuge as its smart outlook. There are fixed
speed and VFD for option.

2) 14 in drilling waste management decanter centrifuge
GNLW363CG-VFD

It is an international high standard
centrifuge with top ranking material and latest design, catering for drilling
waste management.

As 14 inch centrifuge is the most normal size
for oil and gas drilling field, GN offers a Economic standard for option, with
good price but better quality than normal Chinese brand.

3) 18 in low speed centrifuge GNLW452

It is a economic standard centrifuge mainly
used for barite recovery, with reliable performance and good price.

4) 22 in big bowl decanter centrifuge GNLW553-VFD

It is a big bowl big capacity centrifuge
welcomed for mud solids control and drilling waste management field.

5) Progressive balance elliptical motion
shale shaker

6) Solids control shale shaker and mud
cleaner

System for 2015 CIPPE oil show

1) GN takes a complete drilling waste
management drying system for the show, the system includes a high speed VFD
centrifuge and vertical cuttings dryer.

2) Besides drilling waste management, GN is
China leading manufacturer for compact mud system for HDD, CBM, Coal Drilling,
piling, etc…

GNSM-500B mud cleaning system for piling was showed on
2015 CIPPE.

And all the systems and most of the equipment
have been sold out already. GN now arrange shipment for them after the show.

What is Geothermal drilling

Geothermal drilling is used for geothermal steam and hot water well drilling. It is a special technology and necessary method for the exploration, exploitation of geothermal fluid.

For the high temperature geothermal drilling, drilling depth is generally 500 meters to 2000 meters, a little more than 2000 meters, mostly in 600 ~ 900 meters. Regariding to the conduction type geothermal field at low temperature, the average depth is 1800 meters, while the geopressured geothermal drilling can reach to 6000 meters depth.

Features of mud recycling system for Geothermal drilling

1) As the temperature of Geothermal drilling is normally higher. There should be mud cooler before mud recycling system and after mud comes out from well head.

2) There should be galvanized grating to cover the tank tops for a better heat-radiation. Checkered plate is not recommended for Geothermal drilling mud recycling system. The heat cannot come out well in this condition.

3) Normally, there is only desander cone in the mud recyclone system. Desilter cone is not used.

4) As the mud temperature is higher, PU hydraocyclone is not suitable for Geothermal drilling mud recycling system, while cast iron cyclones should be used.

5) And in some cases, geothermal drilling rig platform is low, it means the flow height from drilling rig to shale shaker is lower. It gives strict limitation on shaker tank design.

GN Solids Control got an inquire from a European Geothermal drilling company. They are searching for a mud recycling system for their 750hp Geothermal drilling, and they want a 3-tank mud system.

After communication, we know that their flow height is only 2.6m. Per their condition, we offer tech. proposal together with commercial proposal, customer satisfy and give us order soon. And the system will be dispatch to jobsite soon.

Below is the system proposal we offered for the 750hp Geothermal drilling rig.

1) Shaker tank #1: 6012×2200×1600mm

2) Mixing tank 2# and Storage tank 3#: 11500×2200×2350mm

3) Shale shaker linear motion

4) Desander separate

5) Mixing system and mud agitators

TBM is Tunnel boring machine, it is similar to piling. It is widely used for municipal construction, like subway, tunnel, etc… There are high content coarse rock particles generated during the process. It does not have high standard for mud quantity. No need separate to very small size. It request big capacity for a rough separation, like 120m3/h or 240m3/h mud systm.

Mud plant for TBM Tunnel boring machine

It is compact mud system with double deck shale shaker, and desander hydra cyclone above the shale shaker to used as a combination of mud cleaner. 10’’ Desander cone quantity varies from 1 ~2 for different capacity (120 CBM or 240 CBM). TBM mud system use steel frame screen (e.g. 0.3mm, 0.5mm, etc…) and desander cone. Desilter normally is not used in TBM drilling mud system.

TBM Tunnel boring machine supplier:

1) Akkerman Inc  for Trenchless Tunneling Equipment 

2) Alvenius Industrier AB (Sweden)

3) Associated Polymer Services Ltd Geotechnical and Tunneling Supplies 

CBM (Coal Bed Methane) is more and more widely used. As natural gas as a clean energy type become more and more polular.

CBM (Coal Bed Methane) mud system is similar to HDD (Horizontal Directional Drilling). Compared with TBM and piling, it has a higher request on mud quality.

Mud cleaning system used for CBM drilling:

1) Per different capacity, Shale shaker is single deck or double deck, and utilize shaker screen 2 panels, 3 panels or 4 panels.

2) Desander cleaner

3) Desander cleaner

4) Mixing machine

CBM (Coal Bed Methane) machine supplier:

1) Atlas Copco (America)

2) SCHRAMM (America)

3) Sany Heavy Industry (China)

Desanding plant for TBM and mud cleaning system for CBM us different. They are not changeable. Customer should specify the rig type before order. For any questions on compact mud system, you can contact GN group for solution.