Drilling waste High G shaker

Character of high G shaker

High G shaker is a kind of shale shaker utilize high G force used in waste management field. It is adapt high G force from 7.5 to 8.0 G.image

Upstream equipment of drilling waste of high G shaker

A set of screw conveyor system collect drilling solids separated from shale shaker, desander, desilter and centrifuge,and then transfer and dump to high G shaker for separation.

During this process, clean mud falls into slurry tank under high G shaker, drilling cuttings dump to cutting box and move away by track for further treatment.

Down stream equipment drilling waste of high G shaker

Clean fluids from high G shaker transferred to a waste management high speed centrifuge, fine solids above 2~5 micros will be moved away after centrifuge process.

Leave a Reply

Your email address will not be published. Required fields are marked *