drilling waste management

No effectively can be drilled without having the generation of wastes. The varieties of waste generated include drill cuttings, waste water, spent drilling ?uids,completion ?uids and ?ltration wastes. The contaminants around the wastedepend largely on the varieties of drilling?employed to drill the properly.

With escalating legislation, public awareness and minimum operatorenvironmental standards, the containment, handling and therapy ofdrilling waste has enhanced in importance and now ranks in importancealong side that of drilling ?uids in lots of countries worldwide.

The treatment processes utilised on the waste generated var y from countr y to countr y and extremely substantially rely around the neighborhood legislation. In countries where no legislation exists, several operators will fall back onminimum requirements made use of in other countries or standards set at a corporatelevel.

The Four R’s are a single of quite a few methods to describe the waste management
hierarchy strategy and are crucial when thinking of what our
drilling waste management solution line consist of. The 4 R’s are:Lower, Reuse, Recycle, Recover

The Drilling Waste Management item line is developed to assist maximise compliance using the waste management hierarchy principles,too as ensuring that nearby regulations and standards are compliedwith. In the end, disposal are going to be needed in all instances, be it solids and / orliquids.

GN Solids America-Drilling Waste Management Company

Gn Company Drilling as a result of Manufacturing

A customer contact GN with their inquire that, they want to carry out the reclamation (Treatment and disposal) of the drilling cutting waste which collected and storage in the lined pit by utilizing the routine process as well as this process shall be proceeded when the drilling operation is finalized and the rig moved to other location. Therefore, by researching and studying, they have find out new methodology of treatment and disposal these waste by new technology that was utilized in various global oil and gas industries, instead of the old treatment and disposal process.  

The customer would like to get and utilize this Drilling waste management unit for carrying out the treatment and disposal process of the collected drilling cutting waste in the lined pit. They want to know, if there is available alternative equipment (Unit) in our firm or if GN-Solid Control  Company can provide such equipment (Unit).

Yes, indeed, GN Solids Control cpmpany is the only 1 API manufacturer who is responsible for solids control system, as well as big bowl centrifuge, vertical cuttings dryer, screw conveyor, dewatering unit for drilling waste cuttings management. GN system is used used to recover oil and drilling fluids and reduce the cost.

GN hot sale unit for drilling cuttings waste management:

1-       Augers (or Conveyors): to convey cuttings from shakers and other solid control equipment to Cuttings Dryer.

2-      Cuttings Dryer: to remove excess mud from cuttings.

3-      Fixation Equipment: which is consist of a Mixer and cement Silo and related augers and containers.

4-      Flocculation unit: to flocculate waste water or dumped mud prior to centrifuge.

5-      GBD low speed centrifuge to finalize dewatering process.

If you need more information of GN drilling waste management system, contact GN group.

Drilling waste high G dryer shaker is a special kind of shale shaker. It utilizes high G force mainly used to treat drilling waste cuttings.
Why it is called high G dryer shaker, what is the difference of high G dryer shaker with solids control shale shaker?

Yes, indeed high G dryer shale shaker is a kind of shaker. The difference of high G dryer shale shaker and solids control shale shaker as below:
1) G force different: High G dryer shale shaker may utilize G force around 8.0G during separate the drilling waste cuttings, while solids control shale shaker utilize 6.5G ~ 7G during working. The design and application G force different.
2) Feed type different: High G dryer shaker, it is used to treat drilling cuttings from solids control screen panel (shale shaker, desander, desilter). The cuttings transferred through screw conveyor auger to the high G dryer shaker. In this case, dryer usually is with hopper feeder. While solids control shale shaker is usually with box feeder or weir feeder.
3) As the dryer shaker G force is bigger then solids control shale shaker, in request a strong design for the shaker deck.
In which conditions high G dryer shaker can be used?
1) It is specialized for water based mud drilling cuttings separation. Followed with a high speed centrifuge for LGS. to separate the fine solids.
2) It can be used for oil based mud drilling cuttings separation, as the alternative of vertical cuttings dryer (Vortex G). But is cannot separate oil based cuttings as dryer as vertical cuttings dryer.
How can customer get fast delivery in case urgent?
GN always have high G dryer shaker and solids control shaker in stock in China factory and Houston warehouse.