decanter centrifuge

GNZS594E -HB model of linear motion shale shaker
is a 4 outside patio’s shale shaker with screen area 2 . 7 rectangular meters
and composit materials of screen can be fitted to improve screen working
lifestyle. The 2 sets of spielzeug motor help to supply a new linear motion
vibration as well as max 7. 5G H force for better performance. The actual 4 pc
of body type shaker screen fastened
to shale shaker by 6 pc wedge for quick replace. The four units length will
help drilling cuttings can be process dryer regarding longer drying distance
and gratification. There are 3 options for load box of shale
shaker
depending on what drilling they actually. HB buffer box with regard
to oil & gas drilling shaker, DZ buffer package for Coal Gas Methan or HDD
drilling shaker, hopper buffer box to get drilling waste management cure
shaker.

Other than shale shaker, GN Solids supply a complete set of solids control
equipment as well as drilling waste management such as desander, desilter,
mud cleaner, decanter centrifuge, centrifugal pump, screw pump, auger, straight
cuttings dryer, mud agitator, mud tank, mud gun, etc
. GN Solids present you with a complete design for a full remedy for client,
please make contact with GN website for more information or even call us
directly.

As China top manufacturing on mud solids control and drilling waste management, GN Solids Control exported complete set solids control equipment for Russia customer.
The projects includes below solids control equipment:
1) Solids control shale shaker with linear motion, model GNZS594E.
Model clarification: GN means brand. ZS means linear motion. 59 means the screen width is 59cm. 4 is 4-panel screens. E means it is the E generation from GN Solids Control.

It is a 4-panel linear motion shale shaker can be used for both solids control. It can also be used as high G drying shaker while equipped with 1.94Kw vibration motors and with hopper feeding.
GN offers steel frame screen and composite material screens for GNZS594E 4-panel shaker.
2) Fixed speed decanter centrifuges for solids control and barite recovery. Centrifuge model: GNLW363CG. It is the most popular side decanter centrifuge for drilling rigs.
GN and LW means the brand and centrifuge type. 36 is the centrifuge bowl diameter: 36cm. 3 is the bowl length and diameter ratio. 3 is the most popular ratio for drilling rig decanter centrifuges.
3) Some mud agitators and centrifugal pumps.
Even for the accessory small equipment, GN all made per international high standard, with all materials chose from internal and international famous brand.
For mud agitator, GN chose SOG oil seal and FAG genius bearings.
GN centrifugal pump is equipped with mechanical seal. The material for mechanical seal is tungsten carbon for long time. Bearings are from worldwide famous brand FAG.    
Other solids control equipments can be offered by GN Solids Control:
1) Desander, desilter or mud cleaner with under flow shale shaker. GN do offer 2-panel, 2-panel, and 4-panel under flow shale shaker.
2) Poor boy degasser, it is also name mud gas separator. It is used before shale shaker but after BOP to kill the gas in the mud.
3) Vacuum degasser. It is used after shale shaker but before hydrocyclone separator to kill the very small size gas to protect the cones.
4) Jet mud mixer for barite and polymer mixture.

GN Solids Control is China leading manufacturer on mud solids control and drilling waste management field. As the 1rst API certified solids control company in China, and the first China solids control manufacturer who has warehouse and branch company in Houston, USA, GN can offer you professional solutions on mud treatment for oil and gas drilling.
IN year 2015, GN Solids Control promoted its advance drilling waste management equipment: drilling cuttings solidification unit.
GNGH-15 drill cuttings solidifications unit can dry 15 m3 (max.) cuttings per hour. The oil field drill cuttings solidifications unit is mainly combined of mud mixing tank, cement storage tank, absorber storage tank, the conveyer systems, and electrical control system for the whole system. All items mounted on the tank skid for easy movement. GN offers turnkey solution for customers.
Applications of the drilling cuttings solidifications unit:

1) It can be used to dry the drilling cuttings from solids control system, like from shaker, desander, desilter, mud cleaner, and decanter centrifuge
2) More widely, it is used to dry the drilling cuttings from drilling waste management system. The cuttings from solids control system, after further treated by high G drying shaker, vertical cuttings dryer and decanter centrifuge, it is more suitable for drill cuttings solidification unit to treat.
Other Solids Control equipment offered by GN:
1) Shale shaker: linear motion, it is the first step solids control equipment in drilling rig. Nearly all rigs equipped with shale shaker.
2) Desander, it is the second step solids control equipment
3) Desilter, it is the third step solids control equipment.
4) Mud cleaner: it is the combination of shale shaker, desander and desilter
5) Middle speed and high speed Decanter centrifuge
6) Other solids control equipment: centrifugal pump, centrifuge feed pump, mud agitator, mud gun, poor boy degasser, vacuum degasser,
Other Drilling waste management equipment
1) High speed drilling waste decanter centrifuge and big bowl centrifuge
2) High G force 4-panel drying shaker
3) Vertical cuttings dryer
4) Screw conveyer
5) Drill cuttings solidification unit
6) Thermal Desorption unit

GN 4sests 1000gpm mud process for CPP, was
beat in April, 2015. The particular mud recovery system is a number of stage
mud separation dirt system with mud desander, mud
desilter & centrifuge. For details equipment construction of the mud
system, could you check more from GN 4sets 1000gpm mud recycling where possible
centrifuge system for CPP news.

Our engineer left for CPP jobsite in Northern part of China to give having
service. And he followed down below procedures:
1) Give listing of tools required during having before he came to typically the
jobsite. Let client put together the tools list first to save lots of time.
2) After applications prepared, our engineer head over to jobsite 1-2 days
prior to starting commissioning. To discuss with CPP workers at jobsite and
prepare plan for everyday. The total having period will last about five days.
3) First moment, to arrange mud tank structure at
jobsite. Find right position for mud fish tank, which have good distance
fromHDD going rig. Make balance with the ground, and then put the soil tank to
the correct placement.
After mud tank finish off, mount the framework using desander & desilter immediately
upside on the mud reservoir; mount thecentrifuge framework instantly upside on
the mud aquarium. This framework is designed for quick assembly and
disassembly. Entire cost will be higher, however operation cost will be cheaper
and much time-saving.
4) 2nd day, to connect the wires from power source to be able to mud system,
try to analyze the desander, desilter, decanter centrifuge,
centrifuge feed pump as well as centrifugal pumps.
5) 3 rd day, to do answer questions/ give solutions for all the difficulties
faced in the commissioning.
6) Fourth day, after every thing makes sure no problem, start to analyze the
mud system using drilling mud.
7) Sixth day & sixth moment, our engineer will stay with jobsite to check
the dirt system during working. Right after make sure everything is functioning
normally, our engineer reveals commissioning service feedback notice to jobsite
supervisor allowing him sign and give reviews for our service.
As China and taiwan leading manufacturer for HARD DISK DRIVE mud recycling
system along with solids control
equipment
along with waste management equipment, GN commit to offer better
items, reliable service and ever before work hard to become the Number 1 solids
control manufacturer from China. If you have any needs, pls contact us- GN
Solids Control freely

Related Posts

image

As China
leading manufacturer for solids management & drilling waste management instrumentation, we have a tendency to support continent
market lots with latest technology instrumentation, smart quality and
affordable worth. Recently, we’ve got two Package Drilling waste management
instrumentation prepared delivery for continent market.
2 Ea vertical cuttings appliance with high
telescopic skid
After several years’ analysis and development,
GN Vertical cuttings appliance is functioning in several international oil
drilling jobsite. it’s our honor to figure with international oil service
corporations, like Baker Hughes, Shell, CPVEN, ONGC, NIDC etc.
The new project is for our recent client in
continent with over ten sets land drilling rigs. we’ve got endlessly been
supporting them over two years. Last year they purchase three sets vertical
cuttings appliance & vi sets bottle centrifuge, operating for three
land rigs. once they tested the operating performance, they repeat orders for
two sets vertical cuttings appliance & four sets bottle centrifuge.

image

For now, GN has two varieties of model vertical cuttings dryer: GNCD930 and GNCD730. completely different|completely
different} size cuttings appliance can acceptable different jobsite
necessities. particularly for offshore drilling, GNCD730 vertical cuttings
appliance with smaller size can work higher.
4 Ea bottle centrifuge with feed pump
4 Ea bottle centrifuges divide into two sets.
one set embrace one Ea variable speed bottle decanter centrifuge & one Ea fastened speed centrifuge. they’re operating
for two sets land rig solids management service. this type of combination is
comparatively economic selection. The high worth variable speed centrifuge will
modification speed terribly flexible; the lower cost fastened speed centrifuge
takes regarding 2-3 hours to vary belt pulley-block to induce totally different
speed. They work along to try to to heavy spar recovery (variable speed
centrifuge with lower speed) or cut mud weight (variable speed centrifuge with
high speed & high speed fastened speed centrifuge)
12 Ea screw conveyor
Screw conveyor is employed to transfer wet and
coarse drilling cuttings discharged from sedimentary rock shaker &
desander & desilter to vertical cuttings appliance. The cuttings
appliance can appliance the cuttings, take away the coarse solids and come back
the clean fluids for reprocess.
10 Ea screw pump
4 Ea screw pump is employed for feeding bottle
centrifuge, two Ea screw pump is employed for flushing the vertical cuttings
appliance, the opposite four sets screw pump is employed for transferring back
the clean lubricating substance from vertical cuttings appliance.
For customers committed in solids management
service, drilling waste management service, mud service, drilling service, or
alternative connected oil service corporations, pls contact United States
freely for any necessities. GN Solids management are your most suitable option
on solids management & drilling waste management answer supplier.

Related Posts